Commit Graph

7 Commits

Author SHA1 Message Date
BogDan Vatra
b379161565 Android: Add uninstall option.
Uninstall option will uninstall the test afer has been executed.
It is useful when you are using your own phone to execute the tests.

Change-Id: I2a3f6c3a93099d70c98f9ce059da22c409b55843
Reviewed-by: Eskil Abrahamsen Blomfeldt <eskil.abrahamsen-blomfeldt@digia.com>
2014-07-21 20:38:00 +02:00
BogDan Vatra
e8a97d8743 Android: Use androiddeployqt from qt path.
Change-Id: I085f2b20d1f53e3f5caf0b208f64a75c26a89219
Reviewed-by: Eskil Abrahamsen Blomfeldt <eskil.abrahamsen-blomfeldt@digia.com>
2014-07-21 20:37:51 +02:00
Simo Fält
1d58ec346a Android: Add some ci usage features to Android testrunner
Added new options:
- silent to suppress the noice from ext tools, making it easier to
parse failed test cases.
- ci, to check test insignificance. Requires QMake::Project cpan
module if used.

Also added printing out results after each test as well as full
summary after test run is complete.

Task-number: QTQAINFRA-641
Change-Id: Ie5f02710a939f7526e0dd39979a0cd97ed19f55b
Reviewed-by: Eskil Abrahamsen Blomfeldt <eskil.abrahamsen-blomfeldt@digia.com>
2014-04-09 10:46:40 +02:00
Eskil Abrahamsen Blomfeldt
76eefbe8af Android: Fix missing data from some autotests
After a test ended, we would instantly try to fetch its output,
but at this point, it might still not be available through the
adb interface, probably due to some cache synchronization in the
file system? Adding an arbitrary three second pause between
finishing the test and requesting the file fixes this. If the
error pops up later again, we could do something more robust,
like going in a loop for X seconds until the file has been fetched.
Especially if detecting task finish was successful.

Task-number: QTBUG-37444
Change-Id: I5442e1e0181f489b0626834a390e46c15bc0b371
Reviewed-by: Simo Fält <simo.falt@digia.com>
2014-03-27 15:17:24 +01:00
Simo Fält
c1f76a3347 Adding CI utilities to Android test script
It is now configurable if test results are stored in xml, plain text
or in both formats. Default is xml, like it was,
Max runtime is also configurable so that we can reduce the CI round.
With default setting it takes more than eight hours within current
CI node.
The latest test result dir is linked as latest.

Change-Id: I5d27cefe17e4f86648132db7ec104711d993c3de
Reviewed-by: Eskil Abrahamsen Blomfeldt <eskil.abrahamsen-blomfeldt@digia.com>
2013-10-30 11:29:04 +01:00
Simo Fält
32ca647067 Enabling CI usage for runtests_androiddeployqt.pl
- Fixed issues when having multiple devices connected at the same
  time.
- Fixed hard coded paths
- Removed not existing function call, which caused test run to exit
  too early.
- Added possibility to add and connect to device, configured as env
  variable.

Task-number: QTQAINFRA-641
Change-Id: I8c1e003ce4ffbc9fdd9572dc55eef8fe92330cba
Reviewed-by: Eskil Abrahamsen Blomfeldt <eskil.abrahamsen-blomfeldt@digia.com>
2013-10-20 09:37:33 +02:00
Eskil Abrahamsen Blomfeldt
f1b46a5ee0 Android: Add test script based on androiddeployqt
There are a few problems with the Quadruplor setup in Qt 5.
First of all, it doesn't work with modules, since it has
a hard coded library dependency list. Second of all, it
duplicates the application template, so changes need to also
be duplicated. This often gets out of sync. Third of all,
it duplicates a lot of deployment rules which are now contained
in androiddeployqt.

Task-number: QTBUG-33996
Change-Id: I0630a38aeba7d0075df8fae671abc311fc36de61
Reviewed-by: Paul Olav Tvete <paul.tvete@digia.com>
2013-10-16 08:39:57 +02:00