107 lines
3.8 KiB
C++
107 lines
3.8 KiB
C++
|
/*
|
||
|
**********************************************************************
|
||
|
* Copyright (c) 2003, International Business Machines
|
||
|
* Corporation and others. All Rights Reserved.
|
||
|
**********************************************************************
|
||
|
* Author: Alan Liu
|
||
|
* Created: September 2 2003
|
||
|
* Since: ICU 2.8
|
||
|
**********************************************************************
|
||
|
*/
|
||
|
#include "gregoimp.h"
|
||
|
#include "unicode/ucal.h"
|
||
|
|
||
|
int32_t Math::floorDivide(int32_t numerator, int32_t denominator) {
|
||
|
return (numerator >= 0) ?
|
||
|
numerator / denominator : ((numerator + 1) / denominator) - 1;
|
||
|
}
|
||
|
|
||
|
double Math::floorDivide(double numerator, double denominator,
|
||
|
double& remainder) {
|
||
|
double quotient = uprv_floor(numerator / denominator);
|
||
|
remainder = numerator - (quotient * denominator);
|
||
|
return quotient;
|
||
|
}
|
||
|
|
||
|
int32_t Math::floorDivide(double numerator, int32_t denominator,
|
||
|
int32_t& remainder) {
|
||
|
double quotient;
|
||
|
quotient = uprv_floor(numerator / denominator);
|
||
|
remainder = (int32_t) (numerator - (quotient * denominator));
|
||
|
return (int32_t) quotient;
|
||
|
}
|
||
|
|
||
|
const int32_t JULIAN_1_CE = 1721426; // January 1, 1 CE Gregorian
|
||
|
const int32_t JULIAN_1970_CE = 2440588; // January 1, 1970 CE Gregorian
|
||
|
|
||
|
const int16_t Grego::DAYS_BEFORE[24] =
|
||
|
{0,31,59,90,120,151,181,212,243,273,304,334,
|
||
|
0,31,60,91,121,152,182,213,244,274,305,335};
|
||
|
|
||
|
const int8_t Grego::MONTH_LENGTH[24] =
|
||
|
{31,28,31,30,31,30,31,31,30,31,30,31,
|
||
|
31,29,31,30,31,30,31,31,30,31,30,31};
|
||
|
|
||
|
/**
|
||
|
* Convert a year, month, and day-of-month, given in the proleptic Gregorian
|
||
|
* calendar, to 1970 epoch days.
|
||
|
* @param year Gregorian year, with 0 == 1 BCE, -1 == 2 BCE, etc.
|
||
|
* @param month 0-based month, with 0==Jan
|
||
|
* @param dom 1-based day of month
|
||
|
*/
|
||
|
double Grego::fieldsToDay(int32_t year, int32_t month, int32_t dom) {
|
||
|
|
||
|
int32_t y = year - 1;
|
||
|
|
||
|
double julian = 365 * y + Math::floorDivide(y, 4) + (JULIAN_1_CE - 3) + // Julian cal
|
||
|
Math::floorDivide(y, 400) - Math::floorDivide(y, 100) + 2 + // => Gregorian cal
|
||
|
DAYS_BEFORE[month + (isLeapYear(year) ? 12 : 0)] + dom; // => month/dom
|
||
|
|
||
|
return julian - JULIAN_1970_CE; // JD => epoch day
|
||
|
}
|
||
|
|
||
|
/**
|
||
|
* Convert a 1970-epoch day number to proleptic Gregorian year, month,
|
||
|
* day-of-month, and day-of-week.
|
||
|
* @param day 1970-epoch day (integral value)
|
||
|
* @param year output parameter to receive year
|
||
|
* @param month output parameter to receive month (0-based, 0==Jan)
|
||
|
* @param dom output parameter to receive day-of-month (1-based)
|
||
|
* @param dow output parameter to receive day-of-week (1-based, 1==Sun)
|
||
|
*/
|
||
|
void Grego::dayToFields(double day, int32_t& year, int32_t& month,
|
||
|
int32_t& dom, int32_t& dow) {
|
||
|
int32_t doy;
|
||
|
|
||
|
// Convert from 1970 CE epoch to 1 CE epoch (Gregorian calendar)
|
||
|
day += JULIAN_1970_CE - JULIAN_1_CE;
|
||
|
|
||
|
int32_t n400 = Math::floorDivide(day, 146097, doy); // 400-year cycle length
|
||
|
int32_t n100 = Math::floorDivide(doy, 36524, doy); // 100-year cycle length
|
||
|
int32_t n4 = Math::floorDivide(doy, 1461, doy); // 4-year cycle length
|
||
|
int32_t n1 = Math::floorDivide(doy, 365, doy);
|
||
|
year = 400*n400 + 100*n100 + 4*n4 + n1;
|
||
|
if (n100 == 4 || n1 == 4) {
|
||
|
doy = 365; // Dec 31 at end of 4- or 400-year cycle
|
||
|
} else {
|
||
|
++year;
|
||
|
}
|
||
|
|
||
|
UBool isLeap = isLeapYear(year);
|
||
|
|
||
|
// Gregorian day zero is a Monday.
|
||
|
dow = (int32_t) uprv_fmod(day + 1, 7);
|
||
|
dow += (dow < 0) ? (UCAL_SUNDAY + 7) : UCAL_SUNDAY;
|
||
|
|
||
|
// Common Julian/Gregorian calculation
|
||
|
int32_t correction = 0;
|
||
|
int32_t march1 = isLeap ? 60 : 59; // zero-based DOY for March 1
|
||
|
if (doy >= march1) {
|
||
|
correction = isLeap ? 1 : 2;
|
||
|
}
|
||
|
month = (12 * (doy + correction) + 6) / 367; // zero-based month
|
||
|
dom = doy - DAYS_BEFORE[month + (isLeap ? 12 : 0)] + 1; // one-based DOM
|
||
|
}
|
||
|
|
||
|
//eof
|