f62f846cd3
This patch changes the test262 infrastructure to pass individual flags, specified in the status file, for tests for experimental features, rather than passing --harmony for all runs. With this change, it should be easier to run test262 tests in automation when developing new features. The new workflow would be, when adding a flag, include the flag in the test expectations file, and when removing the flag, remove the lines from the test expectations file. This way, the status file does not have to change when staging or unstaging, and you get the benefit of the automated tests before staging starts. R=adamk CQ_INCLUDE_TRYBOTS=master.tryserver.v8:v8_linux_noi18n_rel_ng Review-Url: https://codereview.chromium.org/2601393002 Cr-Commit-Position: refs/heads/master@{#42249} |
||
---|---|---|
.. | ||
local-tests/test/intl402 | ||
archive.py | ||
BUILD.gn | ||
detachArrayBuffer.js | ||
harness-adapt.js | ||
list.py | ||
prune-local-tests.sh | ||
README | ||
test262.gyp | ||
test262.isolate | ||
test262.status | ||
testcfg.py | ||
upstream-local-tests.sh |
This directory contains code for binding the test262 test suite into the v8 test harness. The tests are checked out as a dependency from https://chromium.googlesource.com/external/github.com/tc39/test262 at a revision specified in the DEPS file as 'data' in this directory. They are fetched with 'gclient sync'. To update to a newer version, please change the DEPS file. Using a newer version, e.g. 'deadbeef' may be possible but the tests are only known to pass (and indeed run) with the DEPS revision. Example: cd data git fetch git checkout deadbeef If you do update to a newer revision you may have to change the test harness adapter code since it uses internal functionality from the harness that comes bundled with the tests. You will most likely also have to update the test expectation file.